Fylands Bridge project site
Case Study

Fylands Bridge

Project Overview

Composite Utility Plan

We prepared a composite utilities drawing that brings together confirmed affected assets and unaffected confirmations in a single, easy to read plan. The drawing shows overhead and buried assets with clear symbology, and includes OS gridlines for quick orientation. Smart, interactive PDFs allow the team to navigate sheets and notes with ease.

Fylands Bridge composite plan overview

Scope and Process

  • Contacted statutory undertakers and telecoms providers for up to date records
  • Collated affected plans for BT, Northern Gas Networks, Northern Powergrid and Northumbrian Water
  • Recorded unaffected confirmations from multiple operators and added them to the key
  • Produced a composite drawing at scale for design and site planning

Who we engaged

Affected Assets

BT Northern Gas Networks Northern Powergrid Northumbrian Water

Not Affected

Bring Energy CityFibre Colt Fulcrum Pipelines GTC Lumen Technologies Mobile Broadband Network Sky UK Sota Utility Assets Verizon Virgin Media Vodafone

Deliverables

  • Smart interactive PDF, bookmarked sheets and searchable notes
  • Composite utilities drawing for print, A1 at 1:2500
  • Provider tracker with dates and references
  • CAD drawings in DWG format as requested by client
Ready When You Are

Start your project with a clear picture

Order a utility search online in minutes and get your results fast.

Get Started