Pitkevy Case Study

Pitkevy overview

Project overview

Client: Harmony Energy

Location: Pitkevy

Date: 03 April 2025

For a small scheme at Pitkevy, we produced a concise composite utilities drawing. The plan combines affected responses from asset owners with clear notes and symbology, delivered as a smart, interactive PDF that is simple to navigate.

Scope and process

  • Requested current records from telecoms and electricity transmission operators
  • Identified affected BT assets and a 275 kV overhead line from SP Energy
  • Recorded not affected confirmations and tracked any pending responses
  • Issued a single sheet composite drawing for quick reference

Who we engaged

Affected:

BTSP Energy 275 kV overhead line

Not affected:

Bring EnergyCityFibreColtGTCLumen TechnologiesScottish Water

Notes and limitations

  • PAS 128 Type D desktop study
  • Digital deliverables intended as a visual guide, for detailed analysis refer to the original plans from each operator
  • Site works should follow HSG47 for underground services, and GS6 for overhead lines
  • Validity typically ninety days from the search date, operators may impose shorter periods

Deliverables

  • Smart interactive PDF, one sheet with bookmarks
  • Composite utilities drawing for print, A3 at 1:2500
  • Response and contact tracker
  • CAD Drawing delievered in DWG as requested by client

Technical Specifications

  • Scale: 1:2500
  • Sheet count: 1
  • Sheet size: A3
Start a new comprehensive search

Contact

info@digsure.co.uk
0800 098 2605